Case Study · No. 011 · Pyrogel®
Pyrogel®
Refining
India

Ethane-propane recovery unit at a refinery in India.

Increased revenue driven from an all-weather solution.

Persistently wet incumbent insulation on a live ethane-propane recovery unit caused steam collapse during monsoon season. Pyrogel® was applied as an overwrap — without shutting the line down — and eliminated the seasonal production shortfall.

~$640k/yr
in recovered margin from monsoon-season stability

Live steam line · monsoon-season overwrap

Live steam line · monsoon-season overwrap

Product
Pyrogel®
Industry
Refining
Application
Ethane-propane recovery unit · live steam line overwrap
Location
India

01 · The Challenge

Persistent wet insulation and monsoon-season production loss.

Excessive heat loss in the header during monsoon caused steam collapse — and a recurring production shortfall.

  • Persistently wet insulation. Tropical / monsoon environment kept the incumbent system saturated.
  • Excessive heat loss in the header. Underlying system was no longer delivering its rated thermal performance.
  • Production shortfalls during monsoon. Unit could not maintain output during heavy-rain periods.

02 · The Solution

Pyrogel® overwrap, applied live, without taking the unit down.

The thin Pyrogel® overwrap restored thermal performance without an outage — a critical advantage given the unit’s operating economics.

  • Applied as an overwrap on live steam line. No shutdown required; work completed in service.
  • Eliminated steam collapse during monsoon. Removed the seasonal pattern of production shortfall.
  • Downtime reduced by 35%. Unplanned interruption fell as steam quality stabilized.
  • Payback in under 6 months. Margin recovery covered the install rapidly.

03 · The Outcome

$640k/year saved · 35% less downtime · live install.

By keeping the steam header dry and thermally efficient through monsoon, Pyrogel® eliminated the seasonal production loss pattern and added approximately $640k per year to the unit’s margin — without ever shutting the line down for the work.

~$640k/yr
Recovered margin
From eliminating monsoon-season production loss.
35%
Downtime reduction
On the recovery unit, year-over-year.
<6mo
Payback
From margin recovery.

Losing margin every rainy season?

Pyrogel® can be applied live, as an overwrap, to restore thermal performance without an outage.