Case Study · No. 033 · Pyrogel® XTF
Pyrogel® XTF
Petrochemical
Malaysia

Butadiene sphere tanks at a petrochemical complex in Malaysia.

Superior asset protection with a 2-in-1 solution.

Two butadiene spheres needed 2-hour passive fire protection (UL 1709, API 521) plus condensation control in a hot, humid climate — and the incumbent light-weight cement system did neither well. Pyrogel® XTF delivered both in one system, with final approval after two inspection rounds.

6weeks
to complete insulation across both spheres

Butadiene spheres · combined PFP + condensation control

Butadiene spheres · combined PFP + condensation control

Product
Pyrogel® XTF
Industry
Petrochemical
Application
Butadiene spheres · 2 tanks, combined PFP + condensation control
Location
Malaysia

01 · The Challenge

PFP + condensation control + hot-humid climate.

The incumbent light-weight cement wasn’t compliant with UL 1709 / API 521; condensation control in the tropical environment was also failing.

  • Not compliant to UL 1709 / API 521. Required 2-hour passive fire protection per spec.
  • Condensation control in hot, humid conditions. Difficult to maintain with the incumbent cement system.
  • Two spheres to insulate. Major scope on a tight schedule.

02 · The Solution

Three layers of Pyrogel® XTF + sacrificial elastomeric foam.

3 × 10 mm Pyrogel® XTF + vapor barrier + 25 mm sacrificial foam + stainless steel cladding — pre-cut in workshop, installed in 6 weeks.

  • 3 × 10 mm Pyrogel® XTF. Layered system delivering 2-hour PFP per UL 1709.
  • Pre-cut from templates off-site. Workshop fabrication enabled fast on-site install.
  • Sacrificial 25 mm elastomeric foam. Outer layer protects the system from impact and abrasion.
  • No drop hazard, lighter loads. EHS profile better than rigid alternatives — no heavy material at height.

03 · The Outcome

Final approval after two inspection rounds.

The operator approved the two spheres after only two inspection rounds — citing ease of application, install speed (6 weeks total), EHS performance, and significant space savings on storage and on the spheres themselves.

6weeks
To complete
Insulation work across both spheres.
2hr
PFP rating
UL 1709 hydrocarbon-pool-fire compliance.
2
Inspection rounds
To final approval.