| |
|
|
-
DOT 2005 :Electrically Heated Pipe in Pipe: The System, the Qualification and Design tools for Field Architects by Vincent Cocault Duverger, Sylvain Denniel, Brett Howard (TECHNIP)
-
DOT 2005: ROSA: New Challenges in West Africa Deepwater Developments by Jean Pierre Dordan, Philippe Demade, Jacques Morand (TOTAL)
-
DOT 2006: Bundle Hybrid Offset Riser Thermal Performance Test on Rosa Project by S. Couprie, R. Hallot, Th. Marty, X. Riou, D.Ferri – Saipem s.a
-
DOT 2006: Jointing method for pipe-by-pipe Installation of plastic lined pipelines Stephen Booth, Stuart McIntyre, Jerry Baker, David Leslie, Boreas Consultants Limited, Stephen Booth, Stuart McIntyre, Jerry Baker, David Leslie, Boreas Consultants Limited
-
OTC 2007: Dalia Flowlines, Risers and Umbilicals; M.Gloaguen, H.Bourdillon, F.Roche, T.Boscal de Reals, Total E+P Angola
-
OTC 2007: Results of New LNG Transfer Technology Development and What Possibilities They Foretell; P.Cox, J. O Sullivan., V.Lehning, Technip
-
OTC 2008: Solving Pipeline Technology Challenges in the GoM by Innovation, Advanced Analysis Tools, and Engineering Competency Paul Jukes, James Wang, Billy Duron, JP Kenny Inc.
-
IBC HPHT 2008: Characterization of Aerogel Blankets for use in HPHT Environments; A.Tomich, M.Saba, Aspen Aerogels, London, England
-
2009 IOPF: Deepwater Pipe-in-Pipe (PIP) Qualification Testing for 350°F Service; Paul Jukes, J P Kenny, Inc Francois Delille, J P Kenny, Inc, Gary Harrison, BP
-
2009 OMAE Thermo-Mechanical Design of Canapu PIP System; Rafael Familiar Solano, Fabio Braga de Azevedo, Petrobras; Malcolm Carr, Leanne Tindall, Atkins Boreas; Anderson Dolinski, Carlos Eduardo Ingar Valer, Technip.
-
2009 OTC Design, Fabrication, and Installation of the First Ever Reeled PiP System in Offshore Brazil; Fabio Braga de Azevedo, Petrobras; Soheil Manouchehri, Anderson Dolinski, Sylvain Denniel, Technip
|
|
|
|